Business Continuity


Business Continuity

Our Disaster Recovery and Business Continuity infrastructure, based on a three-site Business Continuity architecture delivered on Campus and a Disaster Recovery site 180 km away, is among the best in the Italian market for continuity and reliability.
Our Data Centres, managed by highly specialised staff, provide service continuity on two levels: the campus (primary Data Centre), which responds to limited events, is supported by the remote centre (secondary Data Centre) which acts in case of very serious events to guarantee service recovery - including network switching - within at most 4 hours from declaration of the disaster.
To guarantee total continuity of service, Cedacri has provided its data centres with a double power supply using two parallel channels connected to power sources of various types.
Constant testing of our Business Continuity plan (using regular scheduled simulations), not only allows us to train the staff in response, but also enables us to improve the performance of our systems as a whole. To guarantee maximum continuity, Cedacri also provides a workstation recovery service which can be used by the client in case of temporary outage of his own infrastructure.
Cedacri’s offering is completed by consultancy throughout the Business Continuity project and security audits of the client’s information systems to check the adequacy of their solutions to the risks and threats of the context. In this area Cedacri is certified in relation to its continuous improvement and high quality standards.

Advantages

  • Three-site architecture with a Business Continuity infrastructure that is provided in Campus and a DR site at a distance of 180km which can ensure the Customer's business continuity, both in technological terms and for the definition of the processes (BCP and DRP).
  • Data centers controlled by highly-specialized staff and active infrastructures that are ready for service restart in accordance with set time-schedules and guaranteed SLAs
  • Double feeding systems through two parallel-active channels that are connected to energy sources having different origins
  • Constant testing of the Business Continuity plan for staff training and constant improvement of the system performance